By KEST Door Editorial Team · Published 16 October 2026
To request a useful steel security door quotation, send a door schedule with quantities, clearly defined dimensions, swing drawings, wall details, hardware requirements and the destination market. Ask each supplier to identify its assumptions, exclusions and supporting documents. A photograph and an overall size can start a conversation, but they leave too many decisions open for a production order.
This guide is for importers, distributors and project buyers preparing an RFQ for custom residential or villa entrances. It provides a copyable schedule and a quotation comparison checklist. It complements our steel security door buying guide, which explains product selection and performance evidence.

1. State what each dimension measures
Label dimensions as structural opening, frame outside size, door leaf size or required clear opening. Include the measurement unit and drawing revision. These dimensions describe different parts of the entrance; a supplier should not have to infer which one your schedule uses.
For a new opening, attach the proposed wall section and finished floor level. For replacement work, provide measurements and photographs of the existing frame, hinge positions and lock preparation. The Steel Door Institute’s replacement-door measurement guide distinguishes nominal frame-opening dimensions from actual leaf dimensions. Its guidance concerns existing openings; a custom entrance still needs a project-specific drawing.
2. Use a separate row for every distinct opening
Keep a stable door mark from the RFQ through drawing approval, packing and delivery. Split rows whenever dimensions, handing, finish or hardware differ, even if the decorative design is the same.
| Field | Buyer information to provide | Supplier confirmation to request |
|---|---|---|
| Door mark and quantity | Unique opening reference, quantity and drawing revision | Product reference and quantity quoted for that exact row |
| Dimensions and units | Dimension type, width, height, required clear opening and unit | Proposed leaf/frame sizes, installation allowance and drawing |
| Configuration and swing | Single or double leaves, active leaf, sidelights and labelled plan view | Matching swing drawing and agreed handing convention |
| Wall and threshold | Wall build-up, finished thickness, floor level and sill detail | Frame profile, anchorage approach and interface details for review |
| Exposure and finish | Indoor/sheltered/exposed location, coastal conditions, colour reference | Proposed coating, finish sample and maintenance information |
| Hardware and access | Lock, cylinder, handles, hinges, closer and any electronic access requirements | Included items, preparations, compatibility and excluded accessories |
| Required evidence | Destination market, project specification and any required performance classification | Available reports and their applicability to the proposed doorset |
| Delivery scope | Destination, requested delivery basis, site sequence and target programme | Packing, shipment scope, exclusions and an agreed programme |
Mark undecided fields To be confirmed. Ask suppliers to list any resulting price or programme assumptions separately. Do not treat a provisional row as an approved manufacturing instruction.
3. Draw the swing instead of relying on “left” or “right”
Attach a simple plan view identifying inside, outside, hinge side and direction of opening. For unequal pairs, identify the active leaf and each leaf width. Show nearby walls, steps or obstructions that could affect operation.
When retaining existing frames, verify hardware locations on site. The SDI hinge and strike spacing reference cautions against relying on standard manufacturer locations for retrofit work without field verification. The final preparation drawing must match the actual installation.
4. Compare the complete doorset and its evidence
A comparable quotation identifies the leaf, frame, reinforcement, hinges, locking system, glazing if applicable, seals and installation interfaces. Ask how steel thickness is stated and which parts the measurement covers. Avoid treating overall leaf thickness as the steel sheet thickness.
Keep burglary resistance, fire/smoke performance, acoustic performance and weather exposure as separate requirements. Request evidence for the exact configuration where a rating is needed. A steel material description, smart lock feature or certificate for another assembly does not establish the performance of the quoted entrance.
This schedule is procurement guidance, not a building-code assessment or a statement that a KEST model has a particular certification. The project designer and relevant approval bodies should confirm the requirements for the destination and use.
5. Review quotation differences before comparing totals
- Same scope: Are frame, hardware, seals, threshold, accessories and any installation services included or excluded?
- Same configuration: Do model, dimensions, finish and hardware match your current schedule revision?
- Evidence: Are requested reports supplied, pending or unavailable? Record the scope and limitations.
- Approval steps: Which drawings, finish samples and first-off checks are required, and who approves each?
- Commercial basis: Are currency, validity, payment, transport responsibilities and delivery point stated clearly?
- Packing and after-sales items: Are door-mark labels, protection, spare parts and maintenance documents defined?
A lower total may reflect a different hardware set or omitted delivery scope. Resolve those differences in writing before selecting a supplier. Treat requested dates as targets until the programme and approval dependencies are agreed.
6. Send one controlled enquiry package
Use one folder or email thread for the schedule, drawings, finish references and required evidence. Number revisions and list what changed when you resend them. Before production approval, reconcile the signed quotation, approved drawings and hardware list so the order does not contain conflicting instructions.
Copyable enquiry message
Subject: Steel security door RFQ — [project reference] — [schedule revision]
Please review the attached door schedule and drawings for [destination market / project use]. Quote each door mark separately and identify included hardware, finish, packing and delivery scope. List assumptions, exclusions, documents available and information still required. Please confirm the proposed drawing and sample approval steps before production.
Prepare your KEST enquiry
Review KEST steel security doors and villa entrance door designs, then use the architectural door specification checklist to coordinate the wider package. The KEST Door Catalog 2026 provides design references; it does not replace agreed order specifications.
Send your schedule through our project enquiry form, email sales@kestdoor.com, or contact KEST on WhatsApp. Identify any provisional requirements so our team can review the information gaps before preparing a project-specific quotation.